TR EN

Sakarcege Open End Cotton Yarn Mill

Project Details

ESTABLISHMENT: 1995, Sakarcege/ Mary, Turkmenistan

CAPACITY: 10.500 Tons/Year

TOTAL AREA: 10.650 m2 Closed Area, 56.336 m2 Total Area

RAW MATERIAL INPUT : 12.000 Tons Cotton / Year

PRODUCT RANGE

%100 cotton yam Nm 9/1to Nm 40/1 far weaving and knitting to be used in home textile, household linen and towel production and %100 cotton slub yam to be used in denim production.

MACHINERY

2 lines Trützchler blowroom - Blendomat BDT 019 - (German)
36 cards - Trützchler DK 740 - (German)
7 pieces l.st passage draw frames Vouk SH 82-E (ltalian)
7 pieces 2.st passage draw frames Vouk SH-2/D-E with autoleveller (ltalian)
12 pieces Schlafhorst Autocoro SE-8 Open End spinning Machine (German)


Warning: include(parallax-hourse.php): failed to open stream: No such file or directory in /home/engingru/public_html/2.php on line 105

Warning: include(parallax-hourse.php): failed to open stream: No such file or directory in /home/engingru/public_html/2.php on line 105

Warning: include(): Failed opening 'parallax-hourse.php' for inclusion (include_path='.:/opt/cpanel/ea-php56/root/usr/share/pear') in /home/engingru/public_html/2.php on line 105