TR EN

Sakarcege Open End Cotton Yarn Mill

Project Details

ESTABLISHMENT: 1995, Sakarcege / Mary, Turkmenistan

CAPACITY: 10.500 Tons / Year

TOTAL AREA: 10.650 m2 Closed Area, 56.336 m2 Total Area

RAW MATERIAL INPUT : 12.000 Tons Cotton / Year

PRODUCT RANGE

%100 cotton yam Ne 9/1 to Ne 40/1 far weaving and knitting to be used in home textile, household linen and towel production and %100 slub yarn to be used in denim production.

MACHINERY

2 lines Trützchler blowroom - Blendomat BDT 019 - (German)
36 cards - Trützchler DK 740 - (German)
7 pieces l.st passage draw frames Vouk SH 82-E (ltalian)
7 pieces 2.st passage draw frames Vouk SH-2/D-E with autoleveller (ltalian)
12 pieces Schlafhorst Autocoro SE-8 Open End spinning Machine (German)